Chapter 5.28 OIL AND GAS WELLS
Section 5.28.120 Completion requirements.
Within thirty (30) days after any oil or gas well within
the limits of the city shall have been
completed for production of oil or gas, or within thirty (30) days after the same shall have been
completed in cases where the same is abandoned for the reason that a dry hole is found, the slush
pit shall be filled with dirt and leveled off. (Prior code § 28-1-12)
5.28.120