Section 15.64.170 Application for certificate of appropriateness.

         (A)    Every application for a demolition permit or a building permit, including plans and specifications,                 shall be forwarded by the Building Inspector to the CHPC within fifteen (15) days following receipt             of the application by the Building Inspector.

        (B)    The application for issuance of a COA must include:

            (1)    The street address of the property involved.

            (2)    The legal description of the property involved.

            (3)    A brief description of the present improvements situated on the property.

            (4)    A detailed description of the construction, alteration, demolition, or use proposed, together                     with any architect drawings or sketches if those services have been utilized by the                     applicant, and if not, a sufficient description of the construction, alteration, demolition, and                     use to enable anyone to determine what the final appearance and use of the real estate will                 be.

            (5)    The owner’s name.

            (6)    The developer’s name, if different that owner.

            (7)    The architect’s name, if any.

            (8)    A filing fee is required.


(Ord. 777 § 1 (part), 1989: prior code § 41-5-4)
15.64.170


(Ord. No. 2437, Amended, 02/06/2006, Section 15.64.170, Prior Text)